(Please check back in the near future, when we plan to add accessible pdf files for the full text of each of these reports).
Report No. |
Author(s) |
Title |
05T-009 |
Andrew M. Ross
Ying Rong
Lawrence V. Snyder
|
Supply Disruptions with Time-Dependent Parameters |
05T-008 |
Aurélie Thiele |
Robust Stochastic Programming with Uncertain Probabilities |
05T-007 |
Aurélie Thiele |
Robust Linear Optimization with Recourse |
05T-006 |
Aurélie Thiele |
Multiperiod Pricing via Robust Optimization |
05T-005 |
Lawrence V. Snyder |
A Tight Approximation for a Continuous-Review Inventory Model with Supply Disruptions |
05T-004 |
Lawrence V. Snyder |
A Note on the Robust International Sourcing Algorithm of Gutiérrez and Kouvelis |
05T-003 |
Joseph C. Hartman
Stephen L. Liedtka
Lawrence V. Snyder
|
The Impact of US Tax Depreciation Law on Asset Location and Ownership Decisions |
05T-002 |
Michael B. Freimer
Douglas J. Thomas
Jeffrey T. Linderoth
|
Reducing Bias in Stochastic Linear Programs with Sampling Methods |
05T-001 |
Wasu Glankwamdee
J. T. Linderoth |
MW: A Software Framework for Combinatorial Optimization on Computational Grids |
04T-024 |
Joseph C. Hartman
Shangyuan Luo |
Solving the Parallel Replacement Problem Under Economies of Scale and Non-Decreasing Demand with Branch-and-Cut |
04T-023 |
J. T. Linderoth
T. K. Ralphs
|
Noncommercial Software for Mixed-Integer Linear Programming |
04T-022 |
T. K. Ralphs
M. Guzelsoy |
Duality, Warm Starting, and Sensitivity Analysis in Integer Line Programming |
04T-021 |
Nicholas G. Odrey
Gonzalo Mejía |
An Augmented Petri Net Approach for Error Recovery in Manufacturing Systems Control |
04T-020 |
T. K. Ralphs |
SYMPHONY 5.0 User’s Manual |
04T-019 |
T. K. Ralphs
M. V. Galati |
Decomposition in Integer Linear Programming |
04T-018 |
Lawrence V. Snyder
Mark S. Daskin |
A Random-Key Genetic Algorithm for the Generalized Traveling Salesman Problem |
04T-017 |
Lawrence V. Snyder
Mark S. Daskin
Chung-Piaw Teo |
The Stochastic Location Model with Risk Pooling |
04T-016 |
Lawrence V. Snyder
Mark S. Daskin |
Reliability Models for Facility Location: The Expected Failure Cost Case |
04T-015 |
Lawrence V. Snyder |
Facility Location Under Uncertainty: A Review |
04T-014 |
Lawrence V. Snyder
Mark S. Daskin |
Stochastic p-Robust Location Problems |
04T-013 |
Gonzalo Mejía
Nicholas G. Odrey |
Real-Time Control and Error Recovery of Flexible Manufacturing Workstations: An Approach Based on Petri Nets |
04T-012 |
Nicholas G. Odrey
Gonzalo Mejía
|
Error Recovery for Real-Time Manufacturing Control Via Augmented Petri Nets |
04T-011 |
T. K. Ralphs
Menal Guzelsoy |
The SYMPHONY Callable Library for Mixed Integer Programming
|
04T-010 |
Y. Xu
T. K. Ralphs
L. Ladányi
M. J. Saltzman |
ALPS: A Framework for Implementing Parallel Search Algorithms |
04T-009 |
Thomas C. Perry
Joseph C. Hartman |
Allocating Manufacturing Capacity by Solving A Dynamic Stochastic Multi-Knapsack Problem |
04T-008 |
Thomas C. Perry
Joseph C. Hartman |
Flexible Implementation of Dynamic Programs Using Numerical Representations of State Space Vectors |
04T-007 |
Gonzalo Mejía
Nicholas G. Odrey |
Job Shop Scheduling in Manufacturing: An Approach Using Petri Nets and Heuristic Search |
04T-006 |
Jeffrey Linderoth |
A Simplicial Branch-and-Bound Algorithm for Solving Quadratically Constrained Quadratic Programs |
04T-005 |
Peter A. Huegler
Joseph C. Hartman |
Fulfilling Customer Orders for Steel Plates from Existing Inventory |
04T-004 |
Ted K. Ralphs
Matthew J. Saltzman
Margaret M. Wiecek |
An Improved Algorithm for Biobjective Integer Programs and Its Application to Network Routing Problems |
04T-003 |
Louis J. Plebani
Sihua Chen |
Balancing U-Shaped Assembly Lines with Parallel Stations |
04T-002 |
Joseph C. Hartman
Alison Murphy |
Finite Horizon Equipment Replacement Analysis |
04T-001 |
Selcuk Avci
Robert H. Storer |
Compact Local Search Neighborhoods for Generalized Scheduling |
03W-004 |
Andrew M. Ross |
Useful Bounds on the Expected Maximum of Correlated Normal Variables |
03T-010 |
Serkan Özkan
S. David Wu |
Competitive Bidding Strategies in Repeated Procurement Auctions |
03T-009 |
Murat Erkoc
S. David Wu |
Delivery-Date Coordination in an Internal Market via Risk Sharing |
03T-008 |
Louis Plebani
Sihua Chen |
HUP: Heuristic for U-Shaped Parallel Lines |
03T-007 |
Sihua Chen
Louis Plebani |
Balancing U-Shaped Assembly Lines |
03T-006 |
T. K. Ralphs
L. Ladányi |
SYMPHONY 4.0 User’s Manual |
03T-005 |
T. K. Ralphs
M. V. Galati |
Decomposition and Dynamic Cut Generation in Integer Programming |
03T-003 |
Jennifer L. Rogers
Joseph C. Hartman |
Equipment Replacement Under Continuous and Discontinuous Technological Change |
03T-002 |
Alison Kulp
Joseph C. Hartman |
Optimal Tax Depreciation and Loss Carry-Forward and Backward Options |
03T-001 |
Shmuel Oren
Andrew M. Ross |
Can We Prevent the Gaming of Ramp Constraints |
02W-002 |
Gonzalo Mejia
Nicholas G. Odrey |
A Multi-Level Multi-Layer Petri Net Approach to Modeling and Optimization of Production Systems |
02W-001 |
Gonzalo Mejia
Nicholas G. Odrey |
Modeling and Optimization of Production Systems With Timed Color Petri Nets and Heuristic Search
|
02T-005 |
Mingzhou Jin
S. David Wu |
Procurement Auction with Supplier Coalitions: Validity Requirements and Mechanism Design |
02T-004 |
Murat Erkoc
S. David Wu |
Managing High-Tech Capacity Expansion Via Reservation Contracts |
02T-003 |
Peter A. Huegler
Joseph C. Hartman |
Problem Reduction for One-Dimensional Cutting and Packing Problems |
01W-009 |
T. K. Ralphs
J. C. Hartman |
Capacitated Node Routing Problems (Preliminary Progress Report) |
01T-011 |
T. K. Ralphs
L. Ladanyi
M. Esö |
SYMPHONY 2.8 User’s Manual |
01T-010 |
L. Ladanyi
T. K. Ralphs
M. Saltzman |
A Library Hierarchy for Implementing Scalable Parallel Search Algorithms |
01T-008 |
Mingzhou Jin
S. David Wu |
Modeling Capacity Reservation in High-Tech Manufacturing |
01T-007 |
Erhan Kutanoglu
S. David Wu |
Collaborative Resource Planning with Distributed Agents |
01T-006 |
Suleyman Karabuk
S. David Wu |
Incentive Schemes For Semiconductor Capacity Allocation |
01T-005 |
Peiling Wu
Joseph C. Hartman
George R. Wilson |
An Integrated Model and Solution Approach for Fleet Sizing with Heterogeneous Assets |
01T-004 |
S. David Wu
Mary J. Meixell |
Demand Propagation in ERP Integrated Assembly Supply Chains |
01T-003 |
Hakan Golbasi
S. David Wu |
Lead-Time Coordination Between Marketing and Operations in an Internal Market |
01T-002 |
Kadir Ertogral
S. David Wu |
A Bargaining Game for Supply Chain Contracting |
01T-001 |
Suleyman Karabuk
S. David Wu |
Decentralizing Semiconductor Capacity Planning Via Internal Market Coordination |
00T-013 |
Joseph C. Hartman
Hui Wang |
QFD Driven Resource Allocation Models Using Generalized Network Flow Structures |
00T-012 |
Kadir Ertogral
S. David Wu |
A Bargaining Game for Supply Chain Contracting in Electronic Markets |
00T-011 |
Erhan Kutanoglu
S. David Wu |
An Incentive Compatible Mechanism for Distributed Resource Planning |
00T-010 |
Robert H. Storer
Joseph C. Hartman |
The Container Loading Problem with Tipping Considerations |
00T-009 |
Suleyman Karabuk
S. David Wu |
Decentralizing Semiconductor Capacity Planning Via Internal Market Coordination |
00T-008 |
Peiling Wu
Joseph C. Hartman
George R. Wilson |
A Demand-Shifting Feasibility Algorithm for Benders Decomposition |
00T-007 |
Mingzhou Jin
S. David Wu |
Contracting in Electronic Market-Driven Supply Chains: Models and Analysis |
00T-006 |
Mingzhou Jin
S. David Wu |
Forming Supplier Coalitions in eCommerce Auctions: Validity Requirements and a Profit Distribution Mechanism |
00T-005 |
Peter A. Huegler
Joseph C. Hartman
Louis A. Martin-Vega |
An Analysis of Cutting Stock Problems Generated by CUTGEN1 |
00T-004 |
Murat Erkoc
S. David Wu |
Competitive Due-Date Setting Management Across Marketing and Manufacturing |
00T-003 |
Selcuk Avci
M. Selim Akturk
Robert H. Storer |
A Problem Space Algorithm for Single Machine Weighted Tardiness Problems
|
00T-002 |
Joseph C. Hartman
Raymond V. Hartman |
After-Tax Economic Replacement Analysis |
00T-001 |
Robert M. E. Christie
S. David Wu |
Semiconductor Capacity Planning: Stochastic Modeling and Computational Studies |
99T-012 |
Suleyman Karabuk
S. David Wu |
Strategic Capacity Planning in the Semiconductor Industry: A Stochastic Programming Approach |
99T-011 |
Joseph C. Hartman
Tongqiang Wu |
Generalized Economic Life |
99T-010 |
S. David Wu
Hakan Golbasi |
Manufacturing Planning Over Alternative Facilities: Modeling, Analysis and Algorithms |
99T-009 |
Robert H. Storer |
Extensions of and Uses for the Differencing Algorithm for Number Partitioning |
99T-008 |
Joseph C. Hartman |
Parallel Replacement Analysis Under Variable Asset Utilization and Stochastic Demand: The Two Asset Case |
99T-007 |
Jianbiao Pan
Gregory L. Tonkay
Robert H. Storer
Ronald M. Sallade
David J. Leandri |
Gauge Repeatability & Reproducibility Study for a 3-D Solder Paste Inspection System |
99T-006 |
Jianbiao Pan
Gregory L. Tonkay |
A Study of the Aperture Filling Process in Solder Paste Stencil Printing |
99T-005 |
Jianbiao Pan
Gregory L. Tonkay
Robert H. Storer
Ronald M. Sallade
David J. Leandri
|
Critical Variables of Solder Paste Stencil Printing for Micro-BGA and Fine Pitch QFP |
99T-004 |
Kedar S. Naphade
S. David Wu
Robert H. Storer |
Graph-Theoretic Generation of Assembly Plans
Part II: Problem Decomposition and Optimization Algorithms |
99T-003 |
Kedar S. Naphade
Robert H. Storer
S. David Wu |
Graph-Theoretic Generation of Assembly Plans
Part I: Correct Generation of Precedence Graphs |
99T-002 |
S. David Wu
Robin O. Roundy
Robert H. Storer
Louis A. Martin-Vega |
Manufacturing Logistics Research: Taxonomy and Directions |
99T-001 |
Kadir Ertogral
S. David Wu |
Auction-Theoretic Coordination of Production Planning in the Supply Chain |
98W-009 |
Peiling Wu
Joseph C. Hartman
George R. Wilson |
Asset Replacement and Fleet Sizing in the Truck Rental Industry |
98W-008 |
Murat Erkoc
Nicholas G. Odrey
|
A Petri Net Model for Flexible and Dynamic Process Planning |
98T-013 |
Mary J. Meixell
S. David Wu |
Scenario Analysis of Demands in a Technology Market Using Leading Indicators |
98T-012 |
Jianbiao Pan
Gregory L. Tonkay
Alejandro Quintero |
Screen Printing Process Design of Experiments for Fine Line Printing of Thick Film Ceramic Substrates |
98T-011 |
Gregory L. Tonkay
Jianbiao Pan
Kannachai Kanlayasiri |
Substrate Cleanliness Study in the Screen Printing of Thick Film Ceramic Substrates |
98T-010 |
Kadir Ertogral
S. David Wu
Laura I. Burke |
Integrating Production and Transportation Logistics in a Supply Chain Environment: A Lagrangean Decomposition Approach |
98T-007 |
S. David Wu
Mary J. Meixell |
Relating Demand Behavior and Production Policies in the Manufacturing Supply Chain |
98T-006 |
Jonathan D. Green
Nicholas G. Odrey |
Petri Net Models for Analysis and Control of Re-Entrant Flow Semiconductor Wafer Fabrication |
98T-005 |
S. David Wu
Hakan Golbasi |
A Path Constrained Approach to Dynamic Network Routing: A Virtual Clustering and Flow Deviation Algorithm |
98T-004 |
S. David Wu
Hakan Golbasi |
A Multicommodity Flow Model for Manufacturing Planning Over Alternative Facilities |
98T-003 |
Joseph C. Hartman |
An Economic Replacement Model with Probabilistic Asset Utilization |
98T-002 |
Kadir Ertogral
George R. Wilson |
An Approach to Develop Base-Stock Inventory Control Policy in Serial Production Systems with Some Stochastic Features |
98T-001 |
Erhan Kutanoglu
S. David Wu |
Improving Scheduling Robustness via Stochastic Analysis and Dynamic Adaptation |